A new wastewater treatment plant on the eastern side of the existing Merck facility at Carrigtwohill, Co. Cork.
Works included the installation of all required environmental controls and de-watering infrastructure, sub-structure drainage and utility installation, and sumps for the attenuation chamber including walls and base.
The scope also covered sumps for reinforced concrete walls and base, installation of holding down bolts, guardrail with galvanised steel handrails on the RC upstand wall, and construction of the sludge de-watering building.
CLIENT
Merck Group
ARCHITECT
DPS Engineering
STRUCTURAL ENGINEERS
Not disclosed
DURATION
10 Months
QUANTITY SURVEYOR
Not disclosed
SERVICES ENGINEERS
Not disclosed
LOCATION
Carrigtwohill, Co. Cork