Merck Millipore, WWTP, Concrete Works

A new wastewater treatment plant on the eastern side of the existing Merck facility at Carrigtwohill, Co. Cork.

Works included the installation of all required environmental controls and de-watering infrastructure, sub-structure drainage and utility installation, and sumps for the attenuation chamber including walls and base.

The scope also covered sumps for reinforced concrete walls and base, installation of holding down bolts, guardrail with galvanised steel handrails on the RC upstand wall, and construction of the sludge de-watering building.

CLIENT

Merck Group

ARCHITECT

DPS Engineering

STRUCTURAL ENGINEERS

Not disclosed

DURATION

10 Months

QUANTITY SURVEYOR

Not disclosed

SERVICES ENGINEERS

Not disclosed

LOCATION

Carrigtwohill, Co. Cork

AREA

3,648m2